摘要
通过对工程变更和工程签证的区别分析,指出工程管理中存在的问题,提出相应的管理措施,以期切实控制建设工程造价,维护各方的正当合法权益,确保建设项目的顺利实施。
Through analyzing the difference between engineering change and engineering visa,it points out problems existing in engineering management,proposes corresponding administrative measures,with a view to feasibly control construction engineering cost,to maintain legal rights,and to ensure smooth implementation of construction project.