3荆勇,谌军,李柏青,等(Jing Yong, Chen Jun, Li Baiqing, et al). 天广交直流系统并联运行的输电能力的研究(Transmission Capacity Study for Tian-Guang AC and DC Parallel System). 见:第二十七届中国电网调度运行会议论文集(In: Proceedings of the 27th China Electric Power System Control and Operation Conference). 太原(Taiyuan): 2001
4Christofersen D J, Vancers I, Elahi H, et al. A Survey of the Reliability of HVDC Systems Throughout the World During 1997-1998. In: CIGRE Session. Paris: 2000
5王锡凡.现代电力系统分析[M].北京:科学出版社,2004..
6Iba K, Suzuki H, Egawa M, et al. Calculation of Critical Loading with Noise Curve Using Homotopy Continuation Method [ J ]. IEEE Trans on Power Systems, 1991,6 ( 2 ) :584-590.
7Dobson L, Observations on the Geometry of Saddle Node Bifurcation and Voltage Collapse in Electrical Power Systems [ J ], IEEE Trans on Power Systems,1992,39(3) :240 -243.
8Irisarri G D ,Wang X, Tong J,et al. Maximum Load Ability of Power Systems Using Interior Point Non-linear Optimization Method[ J]. IEEE Trans on Power Systems,1997, 12( 1 ) :1622-1629.
9Canizares C A,Alvarado F L,DeMarco C L. Point of Collapse Methods Applied to AC/DC Power Systems[ J ].IEEE Trans on Power Systems, 1992,7 (2):673-683.
10Canizares C A,Alvarado F L. Point of Collapse and Continuation Methods for Large AC/DC Systems [ J ].IEEE Trans on Power Systems, 1993,8(1) :1-8.