期刊文献+

南方河网地区河湖水系连通的实践与思考 被引量:15

Practice and Thinking on the Interconnected River System Network of the Plain River Network Region in South China
原文传递
导出
摘要 南方河网地区是我国人口、资源、产业密集区。随着工业化和城市化进程的加快,南方河网地区面临着河湖萎缩,洪涝灾害频繁,区域抗旱应急能力不足,水污染严重,水质性缺水问题突出等一系列水资源和水环境问题,对区域防洪安全、供水安全和生态安全造成严重影响。在对典型河湖水系连通工程进行归类总结的基础上,探讨了南方河网地区实施河湖水系连通的关键问题,包括连通需求分析,基础条件论证,连通方式选择及连通保障体系的建立。 The Plain River Network Region (PRNR) is the important economic region in China due to its high population density, abundant resources, and intensive industry. With development of urbanization and industrialization,a series of problems on water resources and environment have arisen, such as river-blocking, lake shrinking, flood threat increasing, water pollution worsening and drought resistance lacking, which have resulted in significant adverse effects on flood control, water supply, and ecology health. The new idea of the Interconnected River System Network (IRSN) will be of significance to optimize water resources allocation, abate water pollution, improve the environment, and further to alleviate adverse impacts of human activities and climate change. In this paper, the different cases of IRSN encompassed three main categories,i.e., the easing water shortage, improving water environment, and promoting comprehensive function, were comprehensively reviewed. Results indicate that 1) the water transfer projects play a fundamental role in guaranteeing water supply for city and industry production and agriculture yield, and have been interconnected river network for multi-source water supply, ecological restoration, and environmental improvement; 2) With the development of society, the IRSN Should have multiple objectives not only single function; 3)The IRSN will expand to include benefits of flood control, water supply, and the environment. The key issues of the IRSN strategy in PRNR were discussed as follows: connected demand and premise of the IRSN plan should be demonstrated; the basic requirement should be satisfied; the connected pattern should be chosen according to local conditions; and the guaranteeing system should be built. Theory and technical studies on IRSN projects in the PRNR should be strengthened, especially on water cycles mechanism, trend forecasting and scientific adjustment, water resource allocation, and river health and risk management.
出处 《资源科学》 CSSCI CSCD 北大核心 2011年第12期2221-2225,共5页 Resources Science
基金 中国博士后基金特别资助(编号:201003150) 中央水利前期工作项目(编号:2010518)
关键词 河湖水系连通 案例分析 战略思考 河网地区 Interconnected River System Network (IRSN) Case study Strategic thinking Plain River Network Region(PRNR)
  • 相关文献

参考文献7

二级参考文献62

共引文献130

同被引文献206

引证文献15

二级引证文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部