以轩岗电厂一期工程2×660MW超临界机组为例,对CCS中给水控制方案进行分析、优化,分析给水泵和液力耦合器不匹配的问题,提出了基于模糊自适应PID的给水控制方案。
The feed water control plan of CCS is analyzed and optimized using the example of first phase project 2×660MW supercritical unit of Xuangang power plant.The problem of mismatch of feed water pump and hydraulic coupler are analyzed.The feed water control plan based on fuzzy adaptive PID is proposed.
出处
《自动化应用》
2011年第11期13-15,共3页
Automation Application