期刊文献+

AP-1000核电站设备闸门的焊后热处理

PWHT of Equipment Hatch in AP-1000 Nuclear Power Plant
下载PDF
导出
摘要 以AP-1000型核电站设备闸门这一具体核部件为例,介绍ASME核电建造规范NE分卷关于焊后热处理的规定,并进行了分析和探讨。 Taking equipment hatch in AP-1000 nuclear power plant as an example, this paper introduces, analyzes and discusses PWHT requirements in the NE subvolume of ASME nuclear construction code.
出处 《化工装备技术》 CAS 2011年第6期9-15,共7页 Chemical Equipment Technology
关键词 ASME规范 核电站 核部件 设备闸门 焊接 焊后热处理 ASME code Nuclear power plant Nuclear component Equipment hatch Welding PWHT
  • 相关文献

参考文献7

  • 1ASME Boiler and Pressure Vessel Code, Section III, Subsection NCA, General Requirements for Division 1 and Division 2 [S] . 2001.
  • 2Edition plus 2002 Addenda. Westinghouse Electric Company, LLC. Equipment Hatch (Shop Assembled) [S] . APP-MV50-Z0-002, Rev 0. 2008.
  • 3ASME Boiler and Pressure Vessel Code, Section III, Division 1, Subsection NE, Class MC Components [S] . 2001 Edition plus 2002 Addenda.
  • 4ASME Code, Section IX, Welding and Brazing Qualifications [S] . 2010 Edition.
  • 5ASME Code, Section VIII, Division 1, Rules for Construction of Pressure Vessels [S] . 2010 Edition.
  • 6Westinghouse Electric Company, LLC. Containment Vessel Material Specification SA-738, Gr.B Plates [S] . CPP-MV50-Z0-011, Rev. 1. 2008.
  • 7ASME Boiler and Pressure Vessel Code, Section II, Part A Materials, Ferrous Material Specifications [S]. 2010 Edition.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部