摘要
岩溶地区地质条件复杂,溶洞结构不明,盲目处理会造成无谓的经济损失。通过武广客运专线黎溪特大桥钻孔灌注桩施工,介绍了岩溶地区钻孔桩施工中可能出现的问题及处理方法。
Karst area has complex geological conditions and unclear cave structure, so blind treatment will cause unnecessary economic loss. Through bored pile construction for Lixi Large Passenger Dedicated Line, the possible problems and treatment method during the karst area are introduced in this paper. Bridge in Wuhan-Guangzhou construction of bored pile in
出处
《路基工程》
2011年第6期150-152,共3页
Subgrade Engineering
关键词
岩溶
钻孔桩
施工问题
处理方法
karst
bored pile
construction problems
treatment method