摘要
文章介绍了瀑布沟水电站放空洞检修闸门竖井施工的关键技术,开挖采用反井钻机技术,闸门井一期混凝土及门槽二期混凝土均采用液压滑模施工。
This paper introduces the key technology for the maintenance gate shaft in emptying tunnel of Pubugou hydropower station construction, raise-boring machine was used in maintenance gate shaft excavation and hydraulic slipping form was adopted in gate shaft stage I concrete and the gate slot stage II concrete construction.
出处
《安徽水利水电职业技术学院学报》
2011年第4期24-26,84,共4页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
反井钻机技术
液压滑模
施工
raise-boring machine
hydraulic slipping form
construction