摘要 根据实验结果并通过计算、论证,决定将该起重机副钩的额定起重量由原来的5 t提高到8 t,改造后的副卷扬起重量比原设计增加了60%。根据改造技术要求,经对该起重机结构和机构相关部分的改造设计、核算,使原QDY32/5 tt-25.5-A7起重机能满足生产需要并符合国家标准. Based on the experimental results, calculation and demonstration, decided to use the crane hook of rated capacity from 5 to 8 tons. the Deputy roll lift weight increased by 60% than the original design after the transformation. According to the transformation of technical requirements, According to the structure and mechanism of crane the relevant part of the design, calculation, so that the original QDY32/5 t-25.5-A7 crane can meet the needs of production and in line with national standards.
作者 刘岩竹
出处 《吉林化工学院学报》 CAS 2011年第11期48-50,共3页 Journal of Jilin Institute of Chemical Technology
关键词 冶金 桥式起重机 超载问题 Metallurgy Bridge crane The problem of overload
  • 相关文献

参考文献4

  • 1孙桂林.起重与机械安全工程学[M].北京:北京经济学院出版社,1992.
  • 2张质文.起重机设计手册[M].北京:机械工业出版社,1980.
  • 3GB3811-83.起重机设计规范[S].[S].,..
  • 4GB6067-85.起重机械安全规程[S].[S].,..

共引文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部