期刊文献+

燃煤机组烟气脱硫实时在线监测系统建设探讨

Study on Guodian Qingshan Co-generation Co.Ltd The #12、#11 Coal-Fired Machines Taking off Sulphur Solid Hour On-Line Monitor System GD-850 Construction
下载PDF
导出
摘要 从系统原理入手,具体分析D25硬件结构、GD8配置流程,阐述国电青山热电有限公司实施建设#11、#12燃煤机组烟气脱硫实时在线监测系统的过程,最终实现脱硫数据向湖北省调主站上传,为实现节能环保调度提供了燃煤发电机组真实可靠的基础数据。 Commence from the system principle,concrete analysis D25 hardware structure,GD8 allocation process,describing simly my company implement construction#11,#12 coal-fired machine set smoke spirits take off sulphur solid hour on-line monitor system of process,the end realization takes off a sulphur data to adjust toward the province main the station up spreads,for realization economy energy the environmental protection adjusted a degree to provide a coal-fired true dependable foundation data of the generator set.
作者 徐俊
出处 《科技创业月刊》 2011年第17期142-143,148,共3页 Journal of Entrepreneurship in Science & Technology
关键词 硬接线铺设 通讯电缆铺设 开关量 模拟量 遥信 遥测 CEMS系统 modbus规约 DNP规约 IEC104/IEC102规约 hard connect line paving communication electric cable build switch measure imitate quantity remote information telemetering CEMS system modbus code DNP code IEC104/IEC102 code
  • 相关文献

参考文献2

二级参考文献4

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部