期刊文献+

浅埋隧道穿越复杂不良地质地段施工工艺

下载PDF
导出
摘要 浅埋隧道在穿越复杂地质地段,易发生安全事故和结构物质量问题,通过对重庆陈家坡浅埋隧道施工实例,阐述了浅埋隧道的不良地质情况、结构物设计形式、各种加强支护工艺以及监控量测方法,从而对类似工程问题有更好的借鉴。
出处 《四川建材》 2011年第6期111-112,共2页 Sichuan Building Materials
  • 相关文献

参考文献4

  • 1Oudit G Y,Kassiri Z,Sah R,et al.The molecular physiology of the cardiac transient outward potassium current (Ito) in normal and diseased myocardium[J].J Mol Cell Cardiol,2001,33:851-872.
  • 2Tsuchiya T,Ashikaga K,Honda T,et al.Prevention of ventricular fibrillation by cilostazol,an oral phosphodiesterase inhibitor,in a patient with brugada syndrome[J].J Cardiovasc Electrophysiol,2002,13:698-701.
  • 3Xiao G S,Zhou J J,Cheung Y F,et al.Effects of U50,488H on transient outward and ultra-rapid delayed rectifier K+ currents in young human atrial myocytes[J].Eur J Pharmacol,2003,473:97-103.
  • 4Tani T,Uehara K,Sudo T,et al.Cilostazol,a selective type III phosphodiesterase inhibitor,decreases triglyceride and increases HDL cholesterol levels by increasing lipoprotein lipase activity in rats[J].Atherosclerosis,2000,152:299-305.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部