期刊文献+

20tEBT电炉喷粉造泡沫渣试验

Test of Making Foamed Slag With Injecting Powder in 20t EBT Electric Arc Furnace
下载PDF
导出
摘要 石横特殊钢厂在20tEBT电炉上采用以喷粉造泡沫渣工艺代替过去用锨加入炭粉造泡沫渣工艺,解决了氧化期埋弧效果差、提温困难等问题,冶炼电耗降低10kW·h/t、冶炼时间缩短2~3min,电弧辐射和噪音明显减小。 The process of making foamed slag added carbon powder with spade is replaced by the process of making foamed slag with injecting powder in 20t EBT electric arc furnace of Shiheng special steel plant It has solved the questions of poor submerged arc effect in the oxidation period and difficult enhancement temperature,etc The smelting power consumption is decreased by 10kW·h/t,the smelting time is reduced by 2~3min,and the noise and arc radiation are reduced obviously
出处 《山东冶金》 CAS 1999年第6期34-35,共2页 Shandong Metallurgy
关键词 EBT电炉 喷粉 泡沫渣 埋弧冶炼 EBT electric arc furnace,injecting powder,foamed slag,submerged arc smelting
  • 相关文献

参考文献2

二级参考文献11

  • 1迪林.北京科技大学硕士学位论文[M].,1996..
  • 2陈华强.-[J].钢铁,1988,(11):16-16.
  • 3徐曾启.-[J].钢铁,1989,(3):9-9.
  • 4牛四通.北京科技大学博士学位论文[M].,1995..
  • 5冶金部超高功率电弧炉技术开发协调组.电弧炉炉外精炼技术第1辑[M].北京,1986.23.
  • 6迪林,硕士学位论文,1996年
  • 7牛四通,博士学位论文,1995年
  • 8徐曾启,钢铁,1989年,3期,9页
  • 9陈华强,钢铁,1988年,11期,16页
  • 10冶金部超高功率电弧炉技术开发协调组,电弧炉炉外精炼技术,1986年

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部