摘要
凹陷露天采场排水是一个十分重要的生产工艺环节。根据金堆城露天矿采场实际情况,对采场的汇水量、排水方案、设备选型、验证配套设施、工程概述及安全渡汛需采取的措施进行了详细的说明。
Water drainage in hollow open pit stope is a key link of production.On the basis of fact of Jinduicheng open pit stope,water amount,water drainage plan,type selection,test and verify of equipments,necessary facilities,survey of engineering and measures of flood control were explained.