摘要 安徽琅琊山抽水蓄能电站调压竖井井深70 m,外径20 m,内径18.6 m。利用吊盘、吊笼、卷扬机建立灌浆提升系统,完成井身段固结灌浆。通过优化施工方案、合理组织施工、建立完善的规章制度、加强职工职业培训、严格执行施工安全技术措施,圆满地完成了灌浆施工任务。 The vertical shaft of Langya Mountain pumped storage power station is 70m in depth,20m and 18.6m in outer diameter and inner diameter.The consolidation grouting of the shaft was completed by the aid of hoisting system with sinking stage,suspension cage and winch.The grouting work was successfully completed by optimizing the construction scheme,reasonably organizing construction,establishing perfect rules and regulations,strengthening the vocational training and strictly carrying out construction safety measures.
作者 邓会君 李明
出处 《探矿工程(岩土钻掘工程)》 2011年第11期62-64,共3页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 大直径竖井 灌浆工程 提升系统 吊盘 吊笼 large diameter vertical shaft grouting engineering hoisting system sinking stage suspension cage
  • 相关文献

参考文献4

二级参考文献6

共引文献8

同被引文献16

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部