摘要
通过在海南石碌铁矿采场边坡地质灾害治理工程施工实例,探讨在堆积体预应力锚索防腐及注浆工艺的施工方法。为今后在堆积体锚索防腐及注浆的施工提供参考。
The construction method of anticorrosion and grouting technology for accumulation body pre-stressed anchor cable was discussed based on the field case of a geological disaster treatment in the side slope of Shilu iron mine in Hainan.
出处
《探矿工程(岩土钻掘工程)》
2011年第11期80-82,共3页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
边坡治理
堆积体
预应力锚索
注浆
土工布止浆包
side slope treatment
accumulation body
pre-stressed anchor cable
grouting
slurry blocking package of earth work cloth