摘要
在空调设计过程中利用建筑能耗模拟软件DeST对某五星级酒店的空调负荷构成进行分析,得出酒店建筑的负荷很大一部分来源于新风负荷,通过设置全热回收装置回收排风能量,以提高能量的利用率。
Described the use of building energy simulation software DeST analysis the air conditioning load structure of a five-star hotel in the air conditioning design process.The building has been a large part of the load from the new wind load.By setting up the heat recovery device recovery exhaust energy,improve the utilization ratio of energy.
出处
《节能》
2011年第11期97-99,6,共3页
Energy Conservation
关键词
全热回收装置
能量回收
全空气空调系统
风机盘管加新风系统
all the heat recovery device
energy recovery
the air conditioning system
primary air fan coil system