4Chu B B. Overview Manual GO Methodology[R]. EPRINP-3123 1. Washington: Electric Power Research Institute, 1983.
5Shen Zupei, Wang Yao, Huang Xiangrui. A Quantification Algorithm for a Repairable System in the GO Methodology [J]. Reliability Eng and Syst Safety, 2003, 80(3): 293-298.
8USNRC. An approach for using probabilistic risk assessment in risk- informed decision on plant specific changes to the licensing basis[R]. Regulatory Guide 1.174, Washington DC: Nuclear Regulatory Commission, 1995.
9USNRC. An approach for plant-specific risk-informed decision-making: inservice testing [R]. Regulatory Guide 1.175, Washington DC: Nuclear Regulatory Commission, 1998.
10USNRC. An approach for plant-specific risk-informed decision-making: graded quality assurance [R]. Regulatory Guide 1.176, Washington DC: Nuclear Regulatory Commission, 1998.