基于混合整数规划的冶炼型材生产组织优化

Optimization of Production Organization in Steel-MakingBased on the Mixed Integer Plan Model
下载PDF
导出
摘要 钢铁生产企业首先根据订单合同对数据结构进行优化,将生产过程中可以一起生产的订单合成一个批次,再以炉次为单位进行生产。使得在满足生产规程和考虑组炉要求的基础上对多个目标进行优化,将优化问题建模成一个混合整数规划模型,并通过lingo软件对模型进行了求解,实例计算结果说明了该模型的有效性和可行性。 The data organization in steel industry can be optimized according to the order contracts, that is, put the contracts which can be produced together into a batch and implement the production in the unit of furnace, when we optimize multiple objects on the basis of satisfied production procedure and furnace collection, the optimization problem would become to a mixed integer plan model. In this paper, we have research on this model with LINGO, and the result of the computation with practical data indicates that the model and algorithm are effective and feasible.
作者 程凤 霍佳震
出处 《上海管理科学》 CSSCI 2011年第6期40-42,共3页 Shanghai Management Science
基金 国家自然科学基金重点项目(70832005) 国家自然科学基金重大项目(71090404/71090400)
关键词 炼钢 合同计划 炉次计划 约束优化 Steel-making Contract planning Furnace planning Constrain optimization
  • 相关文献

参考文献6

二级参考文献11

  • 1唐立新,杨自厚,王梦光.炼钢─连铸最优浇次(CAST)计划[J].东北大学学报(自然科学版),1996,17(5):554-558. 被引量:13
  • 2唐立新,杨自厚,王梦光.炼钢-连铸最优炉次计划模型与算法[J].东北大学学报(自然科学版),1996,17(4):440-445. 被引量:32
  • 3Harjunkoski I,Grossmann I E.A decomposition approach for the scheduling of a steel plant production[J].Computers and Chemical Engineering,2001,25(16):47-1660.
  • 4Craig I K,Camisani-Calzolari F R,Pistorius P C.A contemplative stance on the automation of continuous casting in steel processing[J].Control Engineering Practice,2001,9(9):1013-1020.
  • 5Smith A,Smith B.Constraint programming approaches to a scheduling problem in steelmaking[A].University of Leeds School of Computer Studies Research Report Series[C].Leeds:Leeds School Press,1997.1-10.
  • 6Tang L X,Liu J Y,Rong A Y,et al.A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operation Reseach,2000,120(2):423-435.
  • 7Pacciarelli D,Pranzo M.Production scheduling in a steelmaking-continuous casting plant[J].Computers and Chemical Engineer,2004,28(12):2823-2835.
  • 8Numao M,Morishita S.Cooperative scheduling and its application to steelmaking process[J].IEEE Tansactions on Industrial Electronics,1991,38(2):150-155.
  • 9Lee H S,Murthy S S,Haider S W,et al.Primary production scheduling at steelmaking industries[J].IBMJ Res Develop,1996,40(2):231-252.
  • 10殷瑞钰.关于薄板坯连铸─连轧流程的工程分析[J].钢铁,1998,33(1):1-9. 被引量:13

共引文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部