期刊文献+

PLC在延迟焦化装置水力除焦中的应用 被引量:2

Application of PLC in Hydraulic Decoking of Delayed Coking Unit
下载PDF
导出
摘要 延迟焦化装置是炼厂的重要生产装置.其焦炭塔采用水力除焦,除焦过程通过PLC进行控制。焦化装置现用水力除焦控制系统老化严重.功能上和安全上存在很多缺陷.在装置大修期间,对其进行了大幅度的改造,使之成为一套技术先进、功能完善、安全可靠、易操作、易维护的系统。从系统的自组成及重要联锁等方面对改造后的控制系统进行阐述。 Delayed coking unit is the important equipment in petroleum refinery production. Its coke tower is de-coked hydraulically, and the decoking process is controlled by PLC. Current hydraulic decoking control system in coking unit is seriously aged, and there are many defects in its functionality and safety. During overhaul, it was significantly reformatted and had been updated to an advanced system with advanced technology, improved functionality, reliable safety, maintenance. A comprehensive introduction is described for this updated control system configuration and main interlock, etc. easy operation and system in aspect of
出处 《石油化工自动化》 CAS 2011年第6期49-53,共5页 Automation in Petro-chemical Industry
关键词 水力除焦 可编程控制器 高压水泵 除焦控制阀 hydraulic decoking PLC high pressure water pump deeoking control valve
  • 相关文献

参考文献8

二级参考文献23

共引文献23

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部