通过对新疆油田克拉玛依供电公司某变电所一起电源备投装置接线错误造成拒动进行详细分析,找出原因,吸取教训。
A detailed analysis was made on the refuse action of wring error of power automatic bus transfer equipment of Karamay Power Supply Corporation .Causers of the wring error were found out and some experience lesson were drawn.
出处
《电气技术》
2011年第12期80-81,共2页
Electrical Engineering
关键词
电源备投装置
接线错误
拒动
power automatic bus transfer equipment
wring error
refuse action