摘要
采用Morlet小波函数对松花江哈尔滨水源地站1999~2008年逐月断面污染物负荷量变化过程进行小波分析,以多时间尺度揭示10年间污染物负荷量年际变化关系。结果表明,1年、2年、5年时间尺度呈现强周期交替规律,3年、4年呈现弱周期交替规律。污染物负荷量年内变化与地表径流过程基本相符;受2005年松花江污染突发事件影响,该序列存在突变点。
Based on Morlet wavelet function, a wavelet analysis is made on the changing process of the monthly sectional pollution load from 1999 to 2008 obtained from the hydrological station of the water source for Harbin Reach of Songhuajiang River, and then the annual pollution load changing relationships within a period of 10 years are revealed on multiple time scales. The re- suit shows that a strong cycle alternate law is presented on the time scales of one year, two years and five years, while a weak al- ternate law is presented for three years and four years. Moreover, the annual changing of the pollution load is basically coincided with that of the surface runoff process. Nevertheless, a point of discontinuity is there in the time sequence due to the impact from the sudden pollution event of Songhuajiang River happened in 2005.
出处
《水利水电技术》
CSCD
北大核心
2011年第12期16-18,38,共4页
Water Resources and Hydropower Engineering
基金
国家自然科学基金项目"东北地区寒区水循环模拟及其对气候变化的响应机制研究"(51179203)
国家自然科学基金创新群体项目"流域水循环模拟与调控"(51021006)
国家水体污染控制与治理科技重大专项课题"松花江流域水质水量联合调控技术及工程示范"(2008ZX07207-006)
"十一五"国家科技支撑计划课题"松辽流域水资源全口径评价及旱情预测关键技术研究"(2007BAB28B01)
关键词
小波分析
断面污染负荷
演变规律
松花江
wavelet analysis
sectional pollution load
evolution law
Songhuajiang River