4[1]Clay C H.Design of fishways and other fish facilities[Z].Department of Fisheries of Canada, Ottawa, Ontario, Canada.1961.
5[2]Natori Tetsuya.Presentation of fish friendly fishways[J].River Front,1996,(25):6~12 ( Japanese).
6[3]Peterson D F,Mohanthy P K.Flume Studies of Flow in Steep Rough Channels[J].Journal of Hydraulic Division, ASCE, 1960,86(HY9):55~76.
7[4]Matsushita F.Flow Characteristics of Large Scale roughness on the Steep Slope Channel[A].Trans.JSIDRE, 1988,187~197 (Japanese).
8[5]Uddin M Z, Maekawa K,Ohkubo H.Study on Energy Dissipater of Stepped-Weir Channels (in case of perfect jump)[R].Seminar Report, Japan Society of Irrigation, Drainage and Reclamation Engineering (Tohoku Branch), 1999,(44):9~12.
9[6]Rajaratnam N,Katopodis C,Mainali A.Plunging and Streaming Flows in Pool and Weir Fishways[J].Journal of Hydraulic Engineering, ASCE, 1988,114(8):939~944.
10[1]Bell M C. Fisheries Handbook of Engineering Requirements and Biological Criteria [M]. Fisheries-Engineering Research program. Corps of Engineers. 1973.