摘要 从厂拌冷再生技术的施工流程出发,分析泡沫沥青与乳化沥青在冷再生工艺上的不同。由于乳化沥青混合料的养生速度不及泡沫沥青混合料,其压实厚度一般低于后者,通常不超过16cm,而后者可达20cm。此外,泡沫沥青混合料可采用分层施工的方法,泡沫沥青冷再生层的施工总厚度可达到25cm以上,而乳化沥青混合料一般不采用分层施工。乳化沥青冷再生层的养生时间一般长于后者,通常在施工后的4个星期内可取出完整芯样,而后者在施工后的2个星期内即可取出完整芯样。 Starting from the construction process of plant-mix cold recycling technology, the paper analyzes the difference of cold recycling technologies between foamed asphalt and emulsified asphalt. Because the cure speed of emulsified asphalt mixture is lower than foamed asphalt mixture, so the former's compacting thickness is lower than the latter, which is not thicker than 16cm, but the latter can reach 20cm. Moreover, the foamed asphalt mixture can be constructed layer by layer. The total thickness of foamed asphalt cold recycling layer can exceed 25cm. The emulsified asphalt mixture is not constructed layer by layer commonly. The cure time of emulsified asphalt cold recycling layer is longer than foamed asphalt mixture. The integrated core sample of the former can be broken out in 4 weeks after construction is completed, otherwise the time of the latter is in 2 weeks.
作者 吴祥云
出处 《交通标准化》 2011年第24期35-38,共4页 Communications Standardization
关键词 泡沫沥青 乳化沥青 厂拌冷再生 foamed asphalt emulsified asphalt plant-mix cold recycling
  • 相关文献

参考文献5

二级参考文献14

  • 1马捷.泡沫沥青路面冷再生新技术[J].公路与汽运,2004(4):35-36. 被引量:7
  • 2董泽蛟,谭忆秋,曹丽萍.乳化沥青冷再生混合料的室内设计与性能评价研究[J].公路交通科技,2006,23(2):43-47. 被引量:65
  • 3樊统江,徐栋良,贾敬鹏,陈富强.沥青砼路面再生技术及其在国外的发展[J].重庆交通学院学报,2007,26(3):82-87. 被引量:25
  • 4曾梦澜,肖杰,吴超凡,黄开宇.冷再生沥青混合料RAP含量对使用性能的影响[J].中南公路工程,2007,32(2):27-31. 被引量:37
  • 5American Association of State Highway and Transportation Officials (AASHTO).Specification for SuperpaveTM Volumetric Mix Design:Designation MP2-97[S].Washingon D C:AASHTO,1997.
  • 6Asphalt Institute (AI).Asphalt Cold-mix Recycling:AI Manual Series No.21 (MS-21)[M].1st ed.Lexington,KY:Asphalt Institute,1983.
  • 7Asphalt Recycling and Reclaiming Association (ARRA).Guidelines for Cold In-place Recycling[M].Annapolis,MD:ARRA,1991.
  • 8LIEBENBERG J J E,VISSER A T.Towards a Mechanistic Structural Design Procedure for Emulsion-treated Base Layers[J].Journal of the South African Institution of Civil Engineering,2004,46 (3):2-9.
  • 9公路沥青路面再生技术规范.JTJF41-2008,人民交通出版社,2008.
  • 10[4]L.E.Wood,T.D.White,and T.B.nelson.Current Practice of Cold In-Place Recycling of Asphalt Pavements,In Transportation Research Record 1178,TRB,Nation Research Council,Wash ington,DC.

共引文献48

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部