摘要
本文通过分析某黄河大桥介绍,及预算文件的情况介绍,分析预算审核的原则、及预算审核中发现的问题,重点分析了临时设施对的计算和相关定额的选用,达到和大家沟通交流的目的。为便于理解现行定额,本文在审核计算时采用现行定额进行计算。
The paper analyzes a Yellow River Bridge and budget document, and analyzes budget auditing principle, and problems, especially the calculation of the selection of relative quota to achieve the goal of communications and exchange. Being convenient to understand and quota, the article adapts the current quota to calculate.
出处
《价值工程》
2012年第2期92-93,共2页
Value Engineering
关键词
黄河大桥
临时设施
预算
Yellow River Bridge
temporary facilities
budget