期刊文献+

基于SWOT-AHP的广西林下经济发展战略选择研究 被引量:27

Primary Research on the Development Strategy Chioce of Under-Forest Economy in Guangxi Based on SWOT-AHP
下载PDF
导出
摘要 广西林下经济发展的优势明显,大力发展这一地区的林下经济对于完善森林生态系统、提高林农收入水平以及解决“三农”问题等具有十分重要的现实意义。文章以林下经济发展战略为研究目标,运用SWOT—AHP法,从林下经济发展的优势、劣势、机遇、挑战等4个方面设置了区位优势、可持续发展要求、北部湾经济开发开放、法律法规缺失等20个指标,对林下经济发展战略选择进行初步研究。结果表明:实现可持续经营,广西林下经济发展应采取WO和WT战略。 It has obvious advantages of under-forest economy in Guangxi, that has very important practical significance to improve forest ecological system,to improve the imposition of income level and to solve the "Three- Fixed" questions based on vigorously development under-forest economy in the area.h chose the development strategy of under-forest Economy as the research target In this paper by the AHP-SWOT method, beside designed four aspects such as strengths, weaknesses, opportunities and challenges, selected 20 variable indicators, it did preliminary research development strategy choice of the under-forest economy. The results showed that should raked WO and WT strategy to achieve Guangxi under-forest Economy sustainable economic management.
出处 《林业经济》 北大核心 2011年第11期57-60,共4页 Forestry Economics
基金 广西社科规划课题项目“广西‘林改’的综合绩效评价与政策调整研究”(编号:11CJY028)
关键词 林下经济 发展战略 广西 Under-forest economy development strategy Gangxi
  • 相关文献

参考文献8

  • 1NERC. Transmission transfer capability, a reference document for calculating and reporting the electric power transmission capability of interconnected electric systems [R]. Princeton: New Jersey,1995.
  • 2顾晓君,曹黎明,叶正文,黄启忠,朱建军,何大乾.林下经济模式研究及其产业发展对策[J].上海农业学报,2008,24(3):21-24. 被引量:175
  • 3Docket No. RM 95-9-000. Open access same-time information system (formerly real-time information networks) and standards of conduct [S].
  • 4Eiebe G C, Weight J G, Santos-Nieto M. Fast calculation of linear available transfer capability [J]. IEEE Trans on Power Systems,2000,15(3):1112-1116.
  • 5Flueck J, Chiang H D, Shah K S. Investigating the installed real power transfer capability of a large scale power system under a proposed multiarea interchange schedule using CPFLOW [J].IEEE Trans on Power Systems,1996,11(2):883-889.
  • 6Dai Y, McCalley J D, Vittal V. Simplification, expansion and enhancement of direct interior point algorithm for power system maximum loadability [J].IEEE Trans on Power Systems,2000,15(3):1014-1021.
  • 7苑铁军,韦文贤.广西行动,林下经济布局悄然落子--广西林下经济发展观察系列报道之一[N].中国绿色时报,2010-06-14.
  • 8MIKKO KURTTILA,MAUNO PESONEN,JYRKI KAN-GAS, Miika Ka janus. Utilizing the analytic hierarchy process(AHP)in SWOT Analy sis-a hybrid method and its application to a forest-certification case [J]. Forest Policy and Economics, 2000( 1 )41-52.

二级参考文献4

共引文献175

同被引文献199

引证文献27

二级引证文献187

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部