泸定水电站大坝抗震梁的设计优化与施工方法 被引量:2

Design Optimization and Construction of Aseismic Beam in Luding Dam
下载PDF
导出
摘要 泸定水电站地处强震区。大坝抗震工程设计主要由坝体内1350—1382m高程问隔2m水平土工格栅.坝体内1365、1371m和1377m高程的水平抗震框格梁以及上、下游坝坡1365~1381m高程的抗震框格梁三部分组成。坝体内水平抗震框格梁在国内尚属首次使用。就抗震框格梁的设计优化及施工方法予以简单阐述,以供同类工程参考。 The Luding Hydropower Station is located at high seismic zone. The dam aseismic structures mainly consists of the horizontal geogrid between EL. 1 350-1 382 m with a interval of 2 m in dam body, the horizontal cellular aseismie beams in EL. 1 365, 1 371 and 1 377 m in dam body and the cellular aseismic beams in upstream and downstream slope between EL. 1 365-1 381 m. The horizontal cellular aseismie beams in dam body are firstly adopted in China. The design optimization and construction of aseismic beams are introduced herein for reference to similar projects.
出处 《水力发电》 北大核心 2012年第1期44-46,49,共4页 Water Power
关键词 大坝 抗震梁 优化设计 施工方法 泸定水电站 dam aseismic beam design optimization construction method Luding Hydropower Station
  • 相关文献

同被引文献14

  • 1郭永刚,涂劲,陈厚群.高强抗震钢筋在小湾拱坝中的应用[J].中国水利水电科学研究院学报,2007,5(1):49-53. 被引量:1
  • 2沈珠江,郦能惠.高土石坝动力分析及抗震工程措施研究[C]//“八五”国家科技攻关研究报告.南京:水利科学研究院,1995.
  • 3水电水利规划设计总院,等.高土石坝抗震性能及抗震安全研究[R].北京:水电水利规划设计总院,2010.
  • 4晏志勇,王斌,周建平.汶川地震中大中型水电工程震损调查与分析[M].北京:中国水利水电出版社,2009.
  • 5水电水利规划设计总院,等.混凝土坝抗震安全评价体系研究[R].北京:水电水利规划设计总院,2012.
  • 6中国水电顾问集团成都勘测设计研究院.四川省大渡河大岗山水电站可行性研究报告专题-混凝土拱坝抗震设计专题报告[R].成都:中国水电顾问集团成都勘测设计研究院,2006.
  • 7刘峥.关于水电站大坝施工的质量管理要点分析[J].城市建设理论研究(电子版),2013年36期.
  • 8万兆仿.水电站大坝基础灌浆施工的质量控制[J].城市建设理论研究(电子版),2013(31).
  • 9涂劲,李德玉,陈厚群.锦屏一级水电站高拱坝整体抗震安全性研究[J].水力发电学报,2009,28(5):68-72. 被引量:5
  • 10杨星,刘汉龙,余挺,田景元.高土石坝震害与抗震措施评述[J].防灾减灾工程学报,2009,29(5):583-590. 被引量:16

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部