摘要
论述了粉矿回收系统在矿山生产中的重要作用,粉矿回收系统的各种形式及减少粉矿撒落量的技术措施。以白音诺尔铅锌矿为实例提出了竖井粉矿回收方案和斜井粉矿回收方案,分析了两个方案的优点和缺点,通过比较,斜井方案比坚并方案节省投资34.99万元。
The paper expounds the importance and types of fine ore collection in production, andmeasures of decreasing the amount of fine ore. As an example, shaft and incline plans are put forward in Baiyinnuoer Zn - Pb Mine. Strong and weak point of the two plans are analyzed. Inclineplan has an advantage over shaft plan. It can save investment of 349.9 thousand Renminbi.
出处
《有色矿山》
2000年第1期14-17,共4页
Nonferrous Mines