期刊文献+

长沟峪矿安子采区15#煤层采煤方法选择研究 被引量:1

Analysis on 15 # seam mining method selection in Anzi mining area of Changgouyu mine
下载PDF
导出
摘要 长沟峪安子采区地质条件复杂,结合采区工作面具体情况,从设备的选择和资金的投入等方面,通过对各种采煤方法的综合比较分析,认为走向长壁整体顶梁组合悬移支架采煤法,适应长沟峪安子采区的地质构造,且开采成本合理,能保证安全生产和提高资源回收率。 In Changgouyu Anzi mining area geological condition is complex, combined working face specific circumstances, through the selection of equipment and funds investment etc. , and by analyze and comprehensive comparative of the various coal mining methods, it is believe that the whole roof beam combined suspension support longwall mining is adaptation of Changgouyu An Zi mining area's geological structure, and the production cost is reasonable, more safe for production and better resource recovery rate.
作者 郭继圣
出处 《中国煤炭》 北大核心 2011年第12期46-49,共4页 China Coal
关键词 整体顶梁组合悬移支架 采煤方法 复杂地质条件 长沟峪煤矿 the whole roof beam suspended supports coal mining method complicated geological conditions Cbanggouyu coal mine
  • 相关文献

参考文献3

二级参考文献2

  • 1[6]唐春安,王述红,傅宇方.岩石破坏过程数值试验[M].北京:科学出版社,2003:22-24.
  • 2王虹,李变荣.我国短壁机械化开采技术发展现状与思考[A].高效、安全、洁净、结构优化实现煤炭工业的可持续发展—中国科协2005年学术年会论文集[c].太原:山西经济出版社,2005

共引文献10

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部