期刊文献+

铜坑矿92#矿柱群回采过程中的声发射监测应用与分析 被引量:3

THE APPLICATIONS AND ANALYSIS OF THE ACOUSTIC EMISSION MONITORING FOR THE STOPING PROCESS OF THE 92# PILLAR GROUP IN THE TONGKENG MINE
下载PDF
导出
摘要 铜坑矿92#矿体的直接顶板就是开采91#矿体时的胶结或者非胶结的空区充填体,并且尚存在未充填采空区45万m3,使92#缓倾斜厚大矿体的上部形成大范围的隐患区,开采条件十分复杂,地压活动非常频繁。根据矿山实际建立了一套多通道岩体声发射监测系统(本文仅取其中的8个通道),对92#矿体的回采过程进行地压活动监测。本文在现场采集监测数据的基础上,对声发射事件数、波形等参数进行了分析,统计得出了铜坑矿92#矿体回采过程中采场应力场与声发射活动频度之间的相关关系。 The direct roof of the 92# orebody in Tongkeng mine is the consolidated or non-consolidated goaf filling when mining the 91# orebody.Furthermore,over 450,000 m3 goaf are still unfilled forming a vast risk zone over the slowly inclined large and thick orebody,which leads to complex mining conditions and frequent geostatic activity.According to the actual situation of Tongkeng mine,a multi-channel AE monitoring system is established(this article only covers eight channels) in order to monitor the ground pressure in the 92# orebody mining.Based on the monitoring data,this paper analyzes parameters such as the number of AE events and wave,and strikes statistically the correlation between the stress field of mining the 92# orebody in Tongkeng mine and the acoustic emission activity frequency.
出处 《矿冶》 CAS 2011年第4期20-24,共5页 Mining And Metallurgy
基金 "十一五"国家科技支撑计划项目(2008BAB32B02-5)
关键词 声发射 回采 微震 矿柱群 AE stoping microseisms pillar group
  • 相关文献

参考文献5

二级参考文献7

共引文献80

同被引文献73

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部