采用AMS智能设备管理系统与DCS系统一同对现场仪表进行联校,实现了仪表联校时间减少一半,节约近6 d,为丙烯腈装置提前开车奠定了基础。
Instrument was jointly checked by AMS intelligent device management system and DCS system, which reduced the checking time by half, nearly 6 days, provided foundation for the start of acrylonitrile unit ahead of schedule.