爆炸挤淤置换法与悬浮式结构海堤工程 被引量:3

Control-loaded explosive sludge-extruding displacement method in suspended type dam engineering
下载PDF
导出
摘要 介绍了"控制加载爆炸挤淤置换法"专利技术及其在漩门三期围垦工程海堤的施工控制及检测情况,通过工程实践说明,对软基深厚的工程,采用悬浮式堤身结构是经济可行的,应用爆炸挤淤置换法技术施工可保证工程质量并控制工程造价,该工程的设计和施工方法及经验参数可作为以后工程的重要参考。 This paper presents the patent technology principle of "control-loaded explosive sludge-extruding displacement method" and mainly introduces the Xuanmen third-phase reclamation engineering construction control and dam detection. Based on the engineering practice on the deep soft soil foundation, it is concluded that the method is economical and feasible. The application of the control-loaded explosive sludge-extruding displacement technique can guarantee the construction quality of the project and control project cost. The design and construction methods and empirical parameters can be used as a reference for future projects.
作者 江礼茂 许羿
出处 《水运工程》 北大核心 2011年第12期19-24,共6页 Port & Waterway Engineering
基金 浙江省重大科技专项(2009C13010)
关键词 爆炸挤淤置换法 悬浮式堤身结构 堤身检测 堤芯石指标 explosive sludge-extruding displacement method suspended type dam structure dam detection stone index
  • 相关文献

参考文献7

  • 1张建华,顾道良,武可贵,等.水下淤泥质软基的爆炸处理法:中国,87106811[P].1989-06-07.
  • 2江礼茂.控制加载爆炸挤淤置换法:中国,03119314[P].2004-02-25.
  • 3江礼茂.某发电厂防波堤爆炸处理软基的检测结果分析[C]//深圳:第六届工程爆破学术会议论文集,1997.
  • 4袁文喜,方咏来.浙江省玉环县漩门二三期围垦工程设计文件[R].杭州:浙江省水利水电勘测设计院,2004.
  • 5江礼茂,张挺,王江.浙江省玉环县漩门三期围垦工程海堤控制加载爆炸挤淤置换法处理软基施工总结[R].北京:北京中科力爆炸技术工程有限公司,2011.
  • 6中水十二局.玉环县漩门三期围垦工程海堤Ⅱ标段珠港海堤堤心石填筑阶段性总结报告[R].杭州:中水十二局,2009.
  • 7江礼茂.爆炸挤淤筑堤的填料问题[J].水运工程,1998(6):34-36. 被引量:10