摘要
结合参与福建石狮鸿山热电厂煤码头及引堤工程EPC总承包项目设计管理的体会,从设计文件的管理、设计质量的管理、设计变更的管理和设计现场服务管理4个方面对EPC承包模式下施工阶段设计管理的工作进行探索,并指出设计管理中应注意的事项。
According to the practice of design management under the model of EPC's contract of Hongshan heat and power plant coal terminal & jetty engineering in Sheshi city, Fujian province, we make an exploration on design management in the construction stage under the model of EPC's contract from four aspects, including design documents management, design quality management, design alteration management and design site service management. We also point out the matters of attention during design management.
出处
《水运工程》
北大核心
2011年第12期156-159,共4页
Port & Waterway Engineering
关键词
EPC
设计管理
福建石狮鸿山热电厂
施工阶段
探索
实践
EPC
project management
design management
Hongshan heat and power plant in Sheshi city, Fujian province
construction stage
exploration
practice