武汉二七长江大桥3号主塔墩钢吊箱定位测量

On position measurement of steel suspension box at No.3 main tower of Erqi Yangtze River Bridge in Wuhan
下载PDF
导出
摘要 通过对武汉二七长江大桥3号主塔墩钢吊箱定位施工过程的介绍,详细阐述了定位墩卷扬系统钢吊箱定位方案的施工测量技术及控制,经技术措施的有效实施,提高了测量精度和生产效率,加快了施工进度。 According to the introduction about the position construction process of the steel suspension box at No.3 main tower of Erqi Yangtze River Bridge in Wuhan,the paper illustrates the construction measurement technique of position pier hoisting system for the steel suspension box and its control,and indicates it can improve the measurement accuracy and production efficiency and speed up the construction progress by implementing the economic measures effectively.
作者 姜金凤
出处 《山西建筑》 2012年第3期200-201,225,共3页 Shanxi Architecture
关键词 钢吊箱 定位 施工测量技术 steel suspension box position construction measurement technique
  • 相关文献

参考文献4

  • 1CJJ2-2008,城市桥梁工程施工与质量验收规范[S].
  • 2JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 3GB50026-93.工程测量规范[S].[S].,..
  • 4天兴洲长江大桥3号主塔墩钢吊箱围堰施工[Z].2010.

共引文献1960

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部