摘要
结合深基坑支护工程实例,阐述了土钉墙、锚杆支护工程监理过程中的质量控制要点,包括土方开挖的控制、注浆的控制、锚杆支护材料的控制等内容,并介绍了施工阶段监理工作方法,以期指导实践。
Combining with deep foundation pit support engineering as an example,this paper describes quality control points in supervision process of soil-nailing wall and bolt supporting engineering,such as earth excavation,grouting control,bolt supporting material control and so on,and then introduces supervision work methods at construction phase,with a view to guide practice.
出处
《山西建筑》
2012年第3期227-229,共3页
Shanxi Architecture
关键词
深基坑
土钉墙
锚杆支护
监理控制
deep foundation pit
soil-nailing wall
bolt supporting
supervision control