摘要
结合具体工程实例介绍了36m预应力T梁预制工艺和质量控制措施,分别阐述了预制场的布置、主梁预制工艺、T梁张拉方法及孔道压浆流程等内容,指出马蹄形部分振捣密实是施工关键,应保证张拉及压浆质量。
Combining with specific engineering case, this thesis introduces the prefabrication technology and quality control of 36 m prestressed T-beam, respectively describes the layout of prefabrication place, main beam prefabrication technology, T-beam tensioning method, and duct grouting compactness procedure and other contents, and points out horseshoe part compaction is construction key. Therefore, the tensioning and mud jacking quality should be guaranteed.
出处
《山西建筑》
2012年第4期208-209,共2页
Shanxi Architecture
关键词
预应力T梁
张拉程序
孔道压浆
prestressed T-beam, tensioning procedure, duct grouting compactness