结合北京地铁十号线二期的工程建设实例,从工程前期工作各方面入手,针对如何降低地铁建设前期专项工程费用进行了思考,提出应努力降低工程建设前期费用,管理好每一笔支出,尽量减免各项费用,采取各种措施降低成本,并寻求各方面支持。
Combining with engineering construction case of Beijing subway line No.lO phase 11 , starting from various work at early stage of the engineering, the essay thinks out how wot reduces special engineering cost of subway construction at early stage, and puts forward some countermeasures, such as reducing engineering cost at early stage, managing each expenditure, trying to reducing cost, taking various measures for reducing cost, and seeking for support from various aspects.
出处
《山西建筑》
2012年第4期265-266,共2页
Shanxi Architecture
关键词
地铁
专项工程费用
成本控制
subway, special engineering cost, cost control