对新疆伊犁自治州果子沟斜拉桥Z2#主塔施工中针对主塔进行塔梁异步施工的特点,将施工中的测量监控与测量放样结合起来,从而改进工作流程,提高工作效率,确保主塔施工精度。
This paper to Yili autonomous prefecture GuoZiGou cable-stayed bridge of the tower construction Z2 # as an example,the detailed description of the tower in the tower,the characteristics of asynchronous construction beam to the construction of the measurement of monitoring and measurement lofting combined,thereby improving job process,improve work efficiency,and to ensure the accuracy of the construction of the tower.
出处
《城市勘测》
2011年第6期157-159,共3页
Urban Geotechnical Investigation & Surveying
关键词
斜拉桥主塔
塔梁异步施工
施工测量
Cable-stayed bridge of the tower
Tower beam asynchronous construction
Construction survey