摘要
网调要求燃气轮机电厂能够参与一次调频,本文对燃气轮机现有的负荷控制程序进行了分析,并提供了燃气轮机实现一次调频的方案,可供兄弟电厂借鉴。
Gas turbine power plant is required to be involved in primary frequency regulation in terms of grid dispatcher.This thesis gives an analysis about current load control program for gas turbine,and a schedule of realizing primary frequency regulation for turbine is also provided,which can be referred for other power plant.
出处
《燃气轮机技术》
2011年第4期70-72,共3页
Gas Turbine Technology