超前劈裂帷幕注浆在隧道涌水涌碴处理中的应用 被引量:1

Curtain Grouting ahead of the Tunnel Splitting in Gushing Ballast Treatment
下载PDF
导出
摘要 介绍吉林援建垭口山隧道施工过程中涌水涌碴形成原因,采用超前劈裂帷幕注浆治理涌水涌碴方案的原理、设计参数及在定位、钻孔、注浆等施工工艺和质量控制方面的具体要求,列举了施工过程中出现塌孔、返水量较大、注浆量大且泵压不上升及漏水点补救等不同情况的处理方法,总结了超前劈裂围幕注浆的施工条件、关键工艺及施工后的效果. This paper makes a brief presentation on the reasons why ballast has been formed during the process of reconstruction of Yakou mountain tunnel by Jilin province.It introduces the principles of dealing with ballast by split curtain grouting beforehand,and introduces the techniques and the requirements for quality control concerning the design parameters,positioning,drilling and grouting.A list of solutions has been made to dealing with such problems as hole collapse,a large amount of return water,a large quantity of grouting without increasing the pump pressure and leaking remedies.It also summarizes the construction conditions of split curtain grouting beforehand,key techniques and the effectiveness after construction.
出处 《吉林建筑工程学院学报》 CAS 2011年第6期25-27,共3页 Journal of Jilin Architectural and Civil Engineering
关键词 超前劈裂帷幕注浆 隧道 涌水 curtain grouting ahead of split tunnel gushing water
  • 相关文献

参考文献2

二级参考文献5

  • 1刘招伟,张顶立,张民庆.圆梁山隧道毛坝向斜高水压富水区注浆施工技术[J].岩石力学与工程学报,2005,24(10):1728-1734. 被引量:64
  • 2[1]薛文城.隧道遭遇湧水災害之因應對策與處理工法研究--以新永春隧道爲例[硕士學位論文][D].基隆:海洋大學河海工程研究所,2002
  • 3[2]聯合大地工程顧問公司.永春隧道8K+058處突發性湧水崩塌補充地質調查工作報告[R].宜蘭:東部鐵路改善工程局,2000
  • 4[3]東部鐵路改善工程局.新永春隧道南口N8+058處遭遇突發性巨量湧水路線擬改移至東側方案報告書[R].宜蘭:東部鐵路改善工程局,2000
  • 5李治国,孙振川,王小军,牟松,徐海廷,陈飞.厦门翔安海底服务隧道F1风化槽注浆堵水技术[J].岩石力学与工程学报,2007,26(S2):3841-3848. 被引量:32

共引文献7

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部