摘要 大西客运专线上白隧道洞身范围内均含有不同程度的砂层,开挖过程中有大面积的砂层滑落,导致隧道初期支护无法正常施工。经研究决定采用深孔高压注浆,这一方法能使砂层围岩的自稳能力加强,在开挖过程中砂层不会滑落,能使现场正常施工,给下一道工序争取了充足的时间。现场实践证明,深孔高压注浆方法能使砂层隧道正常施工,并且施工工艺简单,易于操作,材料价格适宜,取得了良好的经济效益和社会效益。 Shangbai tunnel on Datong-Xi'an PDL passes through different thick layers of sand. In the process of excavation a large area of sand slide occurred causing tunnel primary support unable to erect and troubles for the normal construction. Relevant experts decided to use deep hole high pressure grouting to strengthen sand layers in the surrounding rock mass, improving their stability capacity in the process of excavation, ensuring the normal construction to the next procedure. Through practice it has been proved, deep hole high pressure grouting can ensure sand tunnel construction, and the process is simple, easy to operate with reasonable material cost. By using this method, good economic and social benefits were achieved .
作者 蒲正林
出处 《铁道标准设计》 北大核心 2011年第B12期137-139,150,共4页 Railway Standard Design
关键词 铁路隧道 深孔高压注浆法 施工 Railway tunnel Deep hole high-pressure grouting Construction
  • 相关文献

参考文献6

  • 1叶书麟.地基处理工程实例应用手册[M].北京:中国建筑工业出版社,2000.
  • 2铁道第二勘察设计院铁路工程设计技术手册·隧道[M].修订版.北京:中国铁道出版社,1999.
  • 3王杰.岩土注浆理论与工程实例[M].北京:科学出版社,2001.
  • 4王杰,杜嘉鸿,陈守庸.注浆技术的发展与展望[J].沈阳建筑工程学院学报,1997,13(1):59-64. 被引量:32
  • 5龚晓南.高等土力学[M].杭州:浙江大学出版社,2003.
  • 6叶书麟 韩杰 叶观宝.地基处理与托换技术[M].北京:中国建筑工业出版社,2000..

二级参考文献1

共引文献73

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部