期刊文献+

既有线铁路框架桥改造设计 被引量:6

Rebuilding Design of Frame Bridge on Existing Railway
下载PDF
导出
摘要 唐山市龙泽南路(复兴路)下穿七滦铁路立交桥改造工程,由于轨面高差大,既有建筑物多,涉及到拆桥和抬道等技术困难,设计时需要考虑的因素多,设计上有较大的创新。通过合理布孔,线路加固和工作坑防护及路基注浆的优化设计,达到了预期的效果,为以后类似复杂的既有线桥梁改造积累了宝贵的经验。 In the rebuilding project of Qiluan railway frame bridgein Tangshan City, with big difference in track surface elevation and with many existing buildings, the design has to consider many factors and technologi- cal difficulties to be involved in construction, such as removing the old structure and lift the road. Through the optimization design of reasonable hole layout, line reinforcement and working pit protection and subgrade grou- ting, the desired results are achieved, which may provide valuable experience for future transformation of similar complex bridges of existing railways.
作者 杨涛
出处 《石家庄铁道大学学报(自然科学版)》 2011年第4期45-49,共5页 Journal of Shijiazhuang Tiedao University(Natural Science Edition)
关键词 既有线 框架桥 改造 抬道 线路加固 existing railway frame bridge rebuilding lift line line reinforcement
  • 相关文献

参考文献3

  • 1TB 10002.5-2005.铁路桥涵地基和基础设计规范[S],2005.
  • 2TB 10002.1-2005.铁路桥涵设计基本规范[S],2005.
  • 3CJJ 74-1999.城镇地道桥顶进施工及验收规程[S],1999.

同被引文献27

  • 1王朋举,陈建民,杨再光.浅谈小角度框构桥顶进线路加固方案的改进[J].铁道建筑技术,2007(z2):99-100. 被引量:4
  • 2田家琳,李征,刘秀娟.首都国际机场下穿滑行道长大箱涵顶进施工技术[J].铁道标准设计,2007,27(3):51-53. 被引量:14
  • 3铁道第四勘察设计院桥隧处.桥涵顶进设计与施工[M].北京:中国铁道出版社,1983.
  • 4CJJ74-1999 城镇地道桥顶进施工及验收规程[S].
  • 5TBl0005--2010铁路混凝土结构耐久性设计规范[s].
  • 6铁道第三勘察设计院.TB10002,1-2005J460-2005铁路桥涵设计基本规范[S].北京:中国铁道出版社,2009.
  • 7TBl0002.12005,铁路桥涵设计基本规范[S].
  • 8北京铁路局.京铁师[1993]491号顶进式框架立交桥设计施工若干规定[R].北京:北京铁路局,1993.
  • 9北京铁路局.京铁师[2012]755号营业线施工管理及安全实施细则[R].北京:北京铁路局,2005.
  • 10北京铁路局.[2005]108号北京铁路局路外工程管理办法[R].北京:北京铁路局,2005.

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部