摘要
结合黑龙江省八五三农场小东沟水库的除险加固设计,针对水库的泥沙淤积、死水位、输水洞底高程确定等问题进行了分析探讨,以确保除险加固设计的合理性。
Combining with Xiaodonggou reservoir reinforcement design of 853 Farm in Heilongjiang,analysis and discuss on reservoir sediment deposition,dead water and water tunnel height determination,to ensure that the rationality of reinforcement design.
出处
《水利科技与经济》
2011年第12期15-16,共2页
Water Conservancy Science and Technology and Economy
关键词
水东沟水库
除险加固设计
泥沙淤积
死水位
洞底高程
Xiaodonggou reservoir
reinforcement design
sediment deposition
dead water level
bottom elevation