甘再水电站出线塔架设计 被引量:1

Design of outgoing line towers for Kamchay hydropower station
下载PDF
导出
摘要 柬埔寨甘再水电站是以BOT模式承建的工程,为大型二等工程。包括3个发电厂房。其中PH1和PH2电站分别采用了GIS户内开关站、户外开敞式出线站的形式。厂顶及户外的出线塔架在设计上各有其特点。通过结合参照相似工程,对本工程塔架在设计中遇到的相关问题进行了总结。 Kamehay hydropower station in Cambodia is a large-size (2) project constructed in BOT mode. It is composed of 3 power plants, of which PH1 and PH2 plants are respectively provided with GIS indoor switchyard and outdoor open-type outgoing line station. The outgoing line towers on the powerhouse top and at outdoor have their own features in design. With reference to similar projects, the paper analyzes the problems encountered during design of the towers for the project.
出处 《西北水电》 2011年第B12期29-31,共3页 Northwest Hydropower
关键词 柬埔寨甘再水电站 PH1 PH2 出线塔架 总结 Kamchay hydropower station PH1 PH2 outgoing line tower summary
  • 相关文献

参考文献5

  • 1张玮.柬埔寨甘再水电站枢纽基本设计报告[R].西安:中国水电顾问集团西北勘测设计研究院,2007.
  • 2.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003..
  • 3汪一骏.钢结构设计手册(上册)(第3版)[M].北京:中国建筑工业出版社,2004.
  • 4杨建东.某水电站出线门形架结构设计[J].电网与清洁能源,2011,27(4):78-79. 被引量:3
  • 5武汉水利电力学院,大连工学院,华东水利学院合编.水工钢结构[M].北京:水利电力出版社,1979.

二级参考文献6

  • 1中国水电顾问集团西北勘测设计研究院.黄河康扬水电站工程厂房、安装间、右副坝单位工程验收报告[R].2006.
  • 2DIJT5092-1999110-500kV架空送电线路设计技术规程[S].
  • 3GB50009-2001.建筑结构荷载规范[S].[S].,..
  • 4GB50017-2003.钢结构设计规范[S].[S].,..
  • 5DL5077-1997.水工建筑物荷载设计规范[S].[S].,..
  • 6GB50059-92建设部.35-110kV变电所设计规范[S].

共引文献672

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部