摘要
柬埔寨甘再水电站是以BOT模式承建的工程,为大型二等工程。包括3个发电厂房。其中PH1和PH2电站分别采用了GIS户内开关站、户外开敞式出线站的形式。厂顶及户外的出线塔架在设计上各有其特点。通过结合参照相似工程,对本工程塔架在设计中遇到的相关问题进行了总结。
Kamehay hydropower station in Cambodia is a large-size (2) project constructed in BOT mode. It is composed of 3 power plants, of which PH1 and PH2 plants are respectively provided with GIS indoor switchyard and outdoor open-type outgoing line station. The outgoing line towers on the powerhouse top and at outdoor have their own features in design. With reference to similar projects, the paper analyzes the problems encountered during design of the towers for the project.
出处
《西北水电》
2011年第B12期29-31,共3页
Northwest Hydropower