水平破碎岩层隧洞施工工艺——柬埔寨甘再水电站引水隧洞施工管理纪实

Technology for tunneling in horizontal broken rock strata——A record of headrace tunnel construction management for Kamchay hydropower station
下载PDF
导出
摘要 在水平破碎岩层隧洞施工中,需特别注意爆破控制,尽量减少对围岩的扰动,尽可能保持围岩自稳,控制好超欠挖。要对泥岩软弱岩层及时封闭、加强支护。甘再水电站引水隧洞施工中,有三处共计大约200m洞段穿过多层泥岩软弱夹层,在开挖初期,围岩稳定性较好,仅进行了挂网喷砼支护,但后期围岩因局部渗水发生了变形,,造成较大面积的掉块、坍塌,施工人员及时发现,进行了钢拱架联合支护,未发生安全事故。因此,在类似围岩施工时,要及时加强支护尤为重要,不留隐患。 During tunneling in horizontal broken rock strata, special attention should be paid to blasting control so as to minimize disturbance to surrounding rocks and keep the self-stability of these rocks, and control overor under-excavation. The weak mudstone layers have to be enclosed and supported timely. During construction of headrace tunnel for Kamchay hydropower station, there are 3 sections with a total length of about 200m going through weak mudstone interlayers. At the beginning of excavation, the stability of surrounding rocks was good, so only shotcrete-wire mesh support was provided, but at later period, deformation of surrounding rocks happened due to local seepage, which resulted in rock blocks falling and collapse in large area. Construction personnel found the problem timely and carried out combined steel arch frame support, which prevents safety accidence. Therefore, during construction in similar surrounding rocks, it is very important to support the surrounding rocks timely and not leave any hidden danger.
作者 胡克功
出处 《西北水电》 2011年第B12期43-45,共3页 Northwest Hydropower
关键词 水平破碎岩层 隧洞开挖施工 工艺探索 horizontal broken rock strata tunnel excavation technology research
  • 相关文献

参考文献6

二级参考文献21

  • 1徐成光.岩爆预测及防治方法综述[J].西北水电,2005(2):14-17. 被引量:5
  • 2刘浩林,张磊,吴金海,等.云南省昭通柏香林水电站可行性研究报告[R].云南:云南省水利水电期测设计研究院,2003.
  • 3黄克中,梁在潮.水力学计算手册[M].武汉:武汉水利电力大学出版社,1979.
  • 4DL/T5195-2004水工隧洞设计规范[S].2004.
  • 5DL/T5099-1999水工建筑物地下开挖工程施工技术规范[S].1999.
  • 6L/T5144-2001水工钢筋混凝土施工规范[S].2001.
  • 7华东勘测设计研究院.四川省九龙河江边水电站可行性研究报告(工程地质)[R].杭州:华东勘测设计研究院,2006.
  • 8华东勘测设计研究院.引水隧洞工程标开挖支护施工技术要求[R].杭州:华东勘测设计研究院,2006.
  • 9袁大祥.水利水电工程施工安全技术[M].三峡大学,1991.
  • 10中国水利水电建设集团公司.中国水利水电建设集团公司重大危险因素管理办法[Z].2006.

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部