摘要
根据当地电网延迟形成的现实,及时制定尾工优化目标,解决其存在的问题。制定2011—2012年枯期计划并执行,创发电0.73亿kWh(650万美元)的经济效益。
In view of delayed local grid establishment, targets for optimization of winding-up works were set timely, so as to deal with the existing problems. Plan for the 2011-2012 dry season was worked out and implemented, which creates an economic benefit of 6.50 million USD (power generation of 73 million kWh) .
出处
《西北水电》
2011年第B12期46-48,共3页
Northwest Hydropower
关键词
尾工优化
问题解决
创效益
甘再水电站
工期优化
optimization of winding-up works
problem solution
benefit creation
Kamchay hydropower station
optimization of construction period