摘要
文章结合连云港花果山大道下穿陇海铁路顶进框架桥工程施工实例,着重对软土地基铁路框架桥顶进施工安全技术控制重点进行介绍和总结,并提出相关注意事项。
According to Lianyungang Huaguo Mountain Avenue underpass railway frame bridge jacking engineering construction example,the railway frame bridge jacking construction safety control technology on the soft soil foundation is introduced and summarized,and puts forward some relevant point for attention.