摘要
对中原大化煤气化装置中煤粉锁斗(V-1204)易架桥问题进行剖析,根据架桥的现象和数据变化,判断架桥的原因,最后提出相应的技改措施。
Analyze the reasons for that pulverized coal is easy to crosslink in SCGP Lock Hopper (V-1204). According to the crosslinking condition and data changes, determine the reasons for crosslinking, and propose the corresponding modification measures.
出处
《化工设计通讯》
CAS
2011年第6期66-68,共3页
Chemical Engineering Design Communications
关键词
壳牌煤气化
煤粉锁斗
架桥
技改措施
SCGP(Shell Coal Gasification Process)
pulverized coal lock hopper
coal crosslinking
modification measures