深覆盖层地基修建高面板堆石坝技术难点分析 被引量:4

Analysis on Technical Difficulties of High CFRD Built on Thick Alluvium Deposit
下载PDF
导出
摘要 河口村水库工程拟建的面板堆石坝坝高122.5 m,趾板直接建在约40 m厚的沙砾石覆盖层上。在复杂坝基深覆盖层上修建面板坝的关键是查清覆盖层的组成和结构,应综合对坝体、坝基及防渗墙、板体系(面板、趾板、连接板)进行应力变形分析,并针对河口村大坝特殊性及关键点采取相应的工程处理措施。 The dam height of CFRD which will be bulk at Hekoucun is 122.5 m. The critical issue is to make a thorough investigation of alluvium deposit when CFRD and plinth construct on about 40 m thick complicated thick alluvium deposit directly. Stress and deformation of dam, foundation, cutoff wall and plate system (face slab, plinth, linking plate) should be synthetically analyzed, and corresponding engineering measures should be adopted to aim at specific characteristic and key points of Hekoucun dam.
出处 《人民黄河》 CAS 北大核心 2011年第12期139-140,共2页 Yellow River
关键词 面板堆石坝 坝基 深厚覆盖层 稳定计算 应力 变形 河口村水库 CFRD darn foundation thick alluvium deposit stability calculation stress deformation Hekoueun Reservoir
  • 相关文献

同被引文献24

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部