河口村水库工程施工条件简述 被引量:2

Brief Narration of Construction Condition for Hekoucun Reservior
下载PDF
导出
摘要 介绍了河口村水库工程区地形、地质条件及水文、气象条件。设计中,结合当地交通现状及规划情况,考虑了既满足施工期运输要求,又提高工程运行期防汛抢险可靠程度,还能够服务于地方等因素,对外交通选择新修坝址至裴村外线道路。根据工程布置特点、施工方法、施工机械配套和对外交通选用公路运输等特点,修建场内交通线路。经综合分析,河口村水库工程施工的交通、水电、通信、物资供应等条件优越,水文资料详尽,已具备工程施工的条件。 This paper described the topography, geological, hydrological and weather conditions of Hekoucun Reservoir. During the design, we selected the outside road from new dam site to Peicun Village combining with local traffic situation and planning, considering the construction period that meet the transport requirements, not only improving the reliability of the flood control project operation, but also to serve the local and other factors. Field traffic routes will be built according to the project layout features, construction methods, construction equipments and external transport features, etc. After comprehensive analysis, the transportation, water and power for Hekoucun Reservoir and hydrological data is in detail. , supplies and other conditions are favorable
出处 《人民黄河》 CAS 北大核心 2011年第12期147-148,共2页 Yellow River
关键词 施工条件 地形 水文 交通条件 河口村水库 construction condition topography hydrology traffic situation Hekoucun Reservior
  • 相关文献

同被引文献2

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部