期刊文献+

苏77-5-8H井大斜度穿煤层安全钻井技术 被引量:3

Safety Drilling Technology of Crossing Coal Seam with High-inclination in SU77-5-8H Well
下载PDF
导出
摘要 苏77-5-8H井为苏里格气田苏77区块第一口利用水平井提高山23组开发效益的大斜度穿煤层水平井,目的层山23储集砂岩上部发育厚度25~30 m的碳质泥岩和煤层段,由于煤系地层的特殊性,钻进过程中易坍塌,且煤系地层正好处于入靶前的造斜井段,钻井施工难度大、风险高。在分析了煤层井壁稳定机理基础上,针对苏77区块地层特性和水平井钻井施工的难点,分析了该井主要技术难点,重点从井眼轨迹轨道设计优化、轨迹控制及施工技术措施和钻井液技术等方面对该井安全技术进行了全面的介绍,为今后同类井钻井提供可参考的经验。 SU77-5-8H is the first horizontal well crossing coal seam with high-inclination,by which development benefit was promoted for Shansi group23 in Su77 block of Sulige gas field.The upper part of target bed(Shanxi23) is structured by carbonaceous mudstone and cola seam in the thickness of 20~30 meters.Because of the specialty of coal-bearing stratum,collapsing occurs easily in drilling process,and this coal-bearing stratum is in deviation building section in front of target point with big construction difficulty and high risk.Analysis was made on the main technical points,and introduction was made on the safety technology about design optimization,trajectory control,construction measures and drilling fluid technique.
出处 《探矿工程(岩土钻掘工程)》 2011年第12期13-17,共5页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 煤层 坍塌 井眼轨迹控制 安全钻井技术 钻井液 封堵防塌 抑制性 苏里格气田 coal seam collapsing borehole trajectory control safety drilling technology drilling fluid sealing and anti-collapse inhibition Sulige gas field
  • 相关文献

参考文献7

二级参考文献8

共引文献98

同被引文献11

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部