秦岭电厂750kV送出线路跨越高铁施工探讨 被引量:4

Probe into Construction of Qinling Power Plant 750kV Transmission Project Crossing High-speed Railway
下载PDF
导出
摘要 随着电网建设不断发展,电力线路与铁路、公路等各种架空管线交叉频繁,放线施工难度进一步加大。高速铁路跨越是近年来输电线路张力放线施工过程中遇到的新课题,因高速铁路运行的安全可靠性要求极高,铁路部门规定在高速铁路运行期间不允许有任何跨越物从铁路上方通过。结合近期750 kV线路跨越郑西高铁施工,总结了跨越高铁施工的方法,为以后跨越高铁施工提供借鉴。 With the continuous development of power grid construction, the crossover between transmission line and all kinds of overhead lines, such as railway and highway, is frequently occurred, which further increases the difficulty in construction. It is the new issue to cross high-speed railway in the construction process of transmission lines with stringing under tension in recent years. Since the high-speed railway operation needs high safety and reliability, any objects crossing the railway is not allowed required by the regulations of railway department in high speed railway operation period. According to the construction of 750 kV transmission project crossing Zhengzhou-Xi' an high-speed railway, this paper summarizes the way of construction to cross the high-speed railway.
作者 徐君辉
出处 《陕西电力》 2011年第12期93-95,共3页 Shanxi Electric Power
关键词 750kV 高铁 跨越 750 kV high-speed railway crossing
  • 相关文献

参考文献4

二级参考文献19

共引文献13

同被引文献30

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部